This metric shows the planned or budgeted cost for maintenance actions that have actually been completed within a given period. It does not reflect the actual outcome, but rather what the actions were estimated to cost at the planning stage. For example, if a façade renovation was completed during the year, the budgeted cost is used in this metric.
How is it calculated?
Sum of estimated costs for all maintenance actions marked as completed during the selected time period
Why is it important to follow?
The metric is important because it enables comparison between planned and actual costs for completed actions. This helps property companies analyze budget accuracy, identify systematic deviations, and improve future estimates. It is also a key measure for evaluating the quality of cost forecasting and thereby strengthening control and planning in maintenance operations.