This metric shows the total estimated cost of maintenance actions scheduled as part of planned maintenance (PM) within a defined time period. The cost figures are based on calculations or budgets prepared during the planning stage, before the actions have been carried out. Examples include estimated costs for façade renovations, roof replacements, or installation of new ventilation systems.
How is it calculated?
Sum of estimated costs for all maintenance actions with a scheduled completion date within the selected time period
Why is it important to follow?
The metric is important for budgeting, long-term planning, and resource allocation. It enables property companies to forecast future costs, analyze capacity requirements, and ensure that maintenance actions fit within established financial frameworks. By tracking this metric, organizations can also compare planned costs with actual outcomes, strengthening financial control and decision-making for future investments.