Lead Time: Registered – Scheduled Unit Inspection

The number of days between registration date and scheduled date for unit inspections.

This metric measures the time elapsed from when an inspection is registered in the system until a scheduled date is assigned. It reflects how quickly registered inspections are planned and indicates the responsiveness and efficiency of the scheduling process.

A short lead time means inspections are scheduled quickly, while a longer lead time may point to limited capacity or planning delays.

How is it calculated?

Average of (Scheduled date − Registration date) in days for unit inspections with a scheduled date within the selected period

Why is it important to follow?

This metric helps assess scheduling efficiency and responsiveness. It is used to:

  • Measure the response time from registration to scheduling
  • Identify bottlenecks in the planning workflow
  • Improve resource allocation and scheduling processes
  • Ensure timely communication and operational control

By tracking this metric, property companies can shorten the time between registration and scheduling, leading to a smoother and more predictable inspection process.

Example of data source

Definition

Metric
Lead Time: Registered – Scheduled Unit Inspection
The number of days between registration date and scheduled date for unit inspections.

Average of (Scheduled date − Registration date) in days for unit inspections with a scheduled date within the selected period

Example of data source
System iconPigelloSystem iconUnit4 PMSystem iconAaeron Incit XpandSystem iconFast2System iconVitec Hyra & Teknisk förvaltningSystem iconMomentum FastighetSystem iconHogia DinHyresvärd

Developed together with 45+ real estate companies

Olov LindgrenRevelopHEBAStockholmshemMimerRiksbyggenOlov LindgrenRevelopHEBAStockholmshemMimerRiksbyggen

Liknande