This metric measures the time elapsed between the planned inspection date and the actual completion of the inspection. It reflects how closely inspections are carried out according to schedule and helps evaluate the accuracy of planning and execution.
A positive value indicates that the inspection was completed after the scheduled date, while a negative value means it was completed earlier than planned.
How is it calculated?
Average of (Completion date − Scheduled date) in days for unit inspections with a completion date within the selected period
Why is it important to follow?
This metric is used to analyze planning accuracy and operational efficiency in the inspection process. It helps organizations to:
- Identify deviations between planned and actual inspection times
- Evaluate resource allocation and workload management
- Improve predictability in leasing and maintenance workflows
- Enhance scheduling reliability and tenant communication
By tracking this metric, property companies can ensure inspections are executed in line with plans and continuously improve scheduling performance.