Book demo
Metrics

RP: Scheduled Move-Out Inspection – Completed Move-Out Inspection

The number of days between when a move-out inspection is scheduled and when it is actually carried out.

This metric measures the time span between scheduling a move-out inspection and the actual completion of the inspection. It is an important step in the rental process, as the inspection often determines what actions must be taken before a new tenant can move in. Shorter times between scheduling and completion contribute to a more efficient and predictable process.

This metric is part of Homepal’s set of KPIs for measuring the rental process – from termination to new lease signing. By tracking each step separately, it becomes easier to identify bottlenecks, reduce vacancy periods, and create a more predictable and efficient leasing process.

How is it calculated?

Date of completed move-out inspection – Date of scheduled move-out inspection

Why is it important to follow?

The metric provides insight into how quickly scheduled inspections are carried out. A long delay may point to resource constraints or planning issues, while shorter times often indicate stronger control and smoother leasing flows. By tracking this KPI, property companies can improve scheduling, optimize resource use, and reduce lead times in the rental process.

Example of data source

Definition

Metric
RP: Scheduled Move-Out Inspection – Completed Move-Out Inspection
The number of days between when a move-out inspection is scheduled and when it is actually carried out.

Date of completed move-out inspection – Date of scheduled move-out inspection

Example of data source
System iconPigelloSystem iconUnit4 PMSystem iconAaeron Incit XpandSystem iconFast2System iconVitec Hyra & Teknisk förvaltningSystem iconMomentum FastighetSystem iconHogia DinHyresvärd

Developed together with 45+ real estate companies

Olov LindgrenRevelopHEBAStockholmshemMimerRiksbyggenOlov LindgrenRevelopHEBAStockholmshemMimerRiksbyggen

Liknande