Book demo
Metrics

Scheduled Unit Inspections

The number of unit inspections registered with a scheduled date within the selected period.

Scheduled Unit Inspections represents the number of inspections that have been registered in the system with a scheduled date within a given period. The metric includes both inspections that have already been completed and those not yet carried out, as long as the scheduled date falls within the selected timeframe. This means the focus is on planned workload, not on execution status.

How is it calculated?

Number of registered inspections with a scheduled date within the selected period

Why is it important to follow?

This metric is essential for understanding workload in relation to inspections. It is used for resource planning, capacity analysis, and monitoring scheduling patterns. By tracking scheduled inspections, property companies can identify peak workload periods, optimize staff allocation, and analyze how planning activity develops over time or across regions.

Example of data source

Definition

Metric
Scheduled Unit Inspections
The number of unit inspections registered with a scheduled date within the selected period.

Number of registered inspections with a scheduled date within the selected period

Example of data source
System iconHogia DinHyresvärdSystem iconVitec Hyra & Teknisk förvaltningSystem iconMomentum FastighetSystem iconFast2System iconAaeron Incit XpandSystem iconPigello

Developed together with 45+ real estate companies

Olov LindgrenRevelopHEBAStockholmshemMimerRiksbyggenOlov LindgrenRevelopHEBAStockholmshemMimerRiksbyggen

Liknande